Stone on south side
Main level
The drywallers have spent the end of this week on the main level. They will be nearly complete with the main level drywall by the start of next week. The drywall finish crew plans to start work in the basement tomorrow.
Wednesday, October 27, 2010
Drywall
The drywallers are done hanging the drywall in the basement. After we pass the inspection they will begin finishing the drywall. That means taping the seams filling the screw holes with drywall mud and applying the texture to the walls.
Terrazzo
The work on the terrazzo shower pans begun today. The crew is doing what is called a 'pre-float' as a foundation for the finished terrazzo pan. The pre-float will take about a week and the terrazzo finish will take another week after that.
Backfill
Today the footer and stem wall for the mudroom deck in the courtyard was backfilled. Tim and crew also brought in dirt from the on site pit to bring up the grade in the courtyard, reduce the mud, and gain positive drainage away from the house.
Thursday, October 21, 2010
Stone on east deck
The stone on the east is coming along. The masons have nearly finished all of the stone on the east side of the house.
Tuesday, October 19, 2010
Monday, October 18, 2010
Stain
The stain has begun on the hand carved timbers inside the house. The painters will be finished by tomorrow and the drywallers will begin hanging drywall in the kitchen and great room this week.
Thursday, October 14, 2010
Gypcrete
The gypcrete floors were poured yesterday. Now all of the radiant lines are complete throughout the entire house.
Mudroom footer
Today we poured the footer in the courtyard that will support the stairs outside of the mudroom door. The rest of the wall will be formed and poured next week.
Tuesday, October 12, 2010
Monday, October 11, 2010
Progress.
Drywall has been hung in the garage and in the upstairs bedrooms. Drywall is now in progress in the master bedroom wing.
Friday, October 8, 2010
Drywall!
The drywall was loaded into the house today and the crew from Mountain Top Drywallhas begun work on the upstairs bedrooms. They will be working hard through the weekend to get a good jump on the project.
Radiant lines
The last of the radiant lines are being installed today and at the start of next week. These are the lines in the entry and the and greatroom.
Wednesday, October 6, 2010
Radiant heat
Josh and his crew are doing a good job on the mechanical room. This is a picture of him assembling a header for the radiant floor heating lines.
Great room fireplace
The 4 piece stone assembly is complete. Now all that needs to be done on the fireplace is the stone around it. The fireplace will be completly finished by the end of the week.
Tuesday, October 5, 2010
Friday, October 1, 2010
Greatroom Hearth
The hearth has been installed in the greatroom. The 1800lb piece of stone looks incredible. Today the stone wall beneath the hearth will be set and next week the rest of the fire place assembly will be in place.